I have to start a new project and I have a doubt.
I don’t know if it is better to set it with version 3.9.9 or directly with version 4.0.0 Beta 12?
I would like to proceed with version 4.0.0 but I would not like to have any problems
I would also like to know if the projects already created can then be opened and modified with version 4.0.0 without problems
Thank you
I have switched to version 4 already.
No problems at all with old or new projects. Haven’t had to open 3.9.9 at all since switching.
1 Like
Very well, thank you
1 Like
The new UI with the ability to change themes so so clean, fresh and crisp. The Wappler team have outdone themselves yet again. Wappler is such a treat to the eyes to use now. 
1 Like